Suitable for a range of applications, including land rigs, jackups, semisubmersibles, and drillships

Our BOP handling equipment is designed to increase safety, adheres to recognized standards, and can be tailored to fit your requirements.


The Wrangler BOP handling system is a fast and efficient alternative to assembling the BOP stack on the wellhead. The system enables the BOP stack to be transported via truck in a single, manageable piece, and then slid into place more safely than assembling the stack on site.


The offshore BOP handling system provides efficient and automated handling of both BOPs and Christmas trees. The Cameron BOP handling system is developed in close collaboration with the BOP design department to enhance operational efficiency and speed. We customize handling systems for platforms, jackups, and floaters.